{"id":1763391,"date":"2026-06-08T17:20:14","date_gmt":"2026-06-08T15:20:14","guid":{"rendered":"https:\/\/lexpress-franchise.com\/en-us\/articles\/how-to-open-a-daycare\/"},"modified":"2026-06-05T16:55:35","modified_gmt":"2026-06-05T14:55:35","slug":"how-to-open-a-daycare","status":"publish","type":"post","link":"https:\/\/lexpress-franchise.com\/en-us\/articles\/how-to-open-a-daycare\/","title":{"rendered":"How to Open a Daycare in the US in 2026: Costs, Licensing &amp; Step-by-Step Guide"},"content":{"rendered":"\n<p class=\"has-bold-font-weight\"><strong>The U.S. child care market generated roughly <em>$65 billion<\/em> in revenue in 2024 and is projected to reach <em>$109 billion<\/em> by 2033. With about <em>12.3 million<\/em> children under five enrolled in regular care arrangements, the daycare sector remains one of the largest service-driven small business categories in the country. This guide walks through the licensing, costs, and operational steps that typically apply when opening a daycare in the United States.<\/strong><\/p>\n\n\n\n<p>Several factors explain why entrepreneurs continue to enter the daycare sector. Demand remains strong as more dual-income households and single parents require reliable childcare. According to Grand View Research, the U.S. childcare market is growing at around<strong> 6%<\/strong> annually. Center-based facilities generate about 58% of industry revenue, family childcare homes <strong>24%<\/strong>, and nanny or in-home care <strong>18%<\/strong>. Average daycare tuition in the U.S. reached about <strong>$321<\/strong> per week for center-based care in 2025 (Care.com).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Can Anyone Open a Daycare?<\/h2>\n\n\n\n<p>Opening a daycare is not as simple as registering a business. Every state operates its own child care licensing system, and operators must meet specific minimum requirements before serving children. The exact threshold for licensing depends on the number of children cared for, the location (private home or commercial facility), and the operator&#8217;s qualifications.<\/p>\n\n\n\n<p>Typical baseline requirements across states include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Minimum age of 18 to 21, depending on the state.<\/li>\n\n\n\n<li>High school diploma or equivalent, with additional early-childhood credentials required for centers.<\/li>\n\n\n\n<li>Successful completion of <strong>criminal background checks<\/strong>, including FBI fingerprinting, state criminal repositories, the National Sex Offender Registry, and state child abuse and neglect registries.<\/li>\n\n\n\n<li>Pre-service training in early childhood development, ranging from <strong>6 to 90+ hours<\/strong> depending on the state and program type.<\/li>\n\n\n\n<li>Current CPR and First Aid certification.<\/li>\n\n\n\n<li>Compliance with health, safety, and fire codes for the facility.<\/li>\n<\/ul>\n\n\n\n<p>How hard is it to open a daycare? The answer depends largely on the program type. A licensed family child care home in a private residence typically faces lighter requirements than a center-based daycare. How long does it take to open a daycare? A home daycare ranges from three to six months on average, while a commercial daycare center often takes <strong>9 to 18 months<\/strong> from concept to opening day. Staff who care for children typically need to be certified in CPR and First Aid before the facility can open.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Open a Daycare: Step-by-Step Guide<\/h2>\n\n\n\n<p>The path from concept to opening day generally follows the eight steps below. State-specific requirements may add additional milestones, especially in jurisdictions like New York, California, and Texas with stricter licensing pathways.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 1. Decide the Daycare Type and Choose a Legal Business Structure<\/h3>\n\n\n\n<p>Operators typically choose among three common formats when planning to open a daycare center or home-based program: an in-home family child care (a daycare center at home), a center-based daycare facility, or a faith-based or community-affiliated program. The number of children allowed varies by state and by the legal classification of the program.<\/p>\n\n\n\n<p>Common business structures used in this sector include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Sole proprietorship<\/strong>: simplest to set up, common for home-based programs.<\/li>\n\n\n\n<li><strong>Limited Liability Company (LLC)<\/strong>: separates personal and business liability, common across both home daycares and centers.<\/li>\n\n\n\n<li><strong>S-Corporation or C-Corporation<\/strong>: typically used for larger center-based operations or multi-location plans.<\/li>\n\n\n\n<li><strong>Nonprofit (501(c)(3))<\/strong>: used for faith-based or community-affiliated daycares seeking grant funding.<\/li>\n<\/ul>\n\n\n\n<p>The IRS and the U.S. Small Business Administration publish detailed guidance on choosing a structure. Operators commonly obtain an Employer Identification Number (EIN) from the IRS before applying for state licensing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 2. Research State Licensing Requirements and Secure Permits<\/h3>\n\n\n\n<p>This step is the most administratively complex. Each state&#8217;s department of human services, department of education, or dedicated child care licensing office sets the rules. The federal Office of Child Care maintains a public-facing index at <strong>childcare.gov<\/strong>, and the Administration for Children and Families publishes the National Database of Child Care Licensing Regulations.<\/p>\n\n\n\n<p>Common steps in obtaining a license to open a daycare include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Submit an application to the state child care licensing agency.<\/li>\n\n\n\n<li>Pass criminal background checks for the operator and all staff.<\/li>\n\n\n\n<li>Complete the state-required pre-service training (early childhood education, safe sleep, mandated reporter, CPR\/First Aid).<\/li>\n\n\n\n<li>Pass a facility inspection covering fire safety, sanitation, square footage per child, and outdoor space requirements.<\/li>\n\n\n\n<li>Maintain staff-to-child ratios. Typical infant ratios range from <strong>1:3 to 1:5<\/strong>, preschool ratios from <strong>1:8 to 1:12<\/strong>, and school-age ratios from <strong>1:15 to 1:25<\/strong>.<\/li>\n\n\n\n<li>Secure local zoning approval, business license, and certificate of occupancy.<\/li>\n\n\n\n<li>Obtain general liability insurance and, for vehicle transport, commercial auto coverage.<\/li>\n<\/ul>\n\n\n\n<p>Family child care homes generally face lighter inspection cycles than centers. State-specific home licensing rules are published by each state&#8217;s licensing agency. Renewal cycles, continuing education hours (typically 10 to 24 hours per year), and ratio enforcement vary by jurisdiction.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 3. Create a Business Plan<\/h3>\n\n\n\n<p><a href=\"https:\/\/lexpress-franchise.com\/en-us\/articles\/how-to-create-a-business-plan\/\">Creating a strong business plan<\/a> documents the daycare&#8217;s concept, market positioning, financial projections, and operational structure. Lenders and grant programs typically require one before approving funding.<\/p>\n\n\n\n<p>Standard components include an <strong>executive summary, market analysis, services<\/strong> and <strong>pricing, marketing strategy, operations plan, staffing plan<\/strong>, and <strong>three-year financial projections<\/strong> covering startup costs, monthly revenue, payroll, and projected break-even. The SBA publishes free templates and resources for child care business planning.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 4. Find a Location<\/h3>\n\n\n\n<p>Location requirements differ for home-based and center-based daycare programs. A home daycare uses an existing residence that meets state inspection standards. A center-based daycare requires a commercial space with specific square footage per child (commonly <strong>35 square feet of indoor space per child<\/strong>), accessible outdoor play areas, and code-compliant kitchen and bathroom facilities.<\/p>\n\n\n\n<p>Operators typically evaluate locations near residential neighborhoods, employment hubs, and major roads to minimize parent commute times. Some states require zoning approval before licensing, which can extend the timeline.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 5. Procure Equipment<\/h3>\n\n\n\n<p>Equipment lists vary by age group served. Common items for licensed child care facilities include cribs and napping mats, child-sized tables and chairs, age-appropriate toys and learning materials, art supplies, books, outdoor play equipment, and first-aid kits. Center-based operations also invest in commercial-grade kitchen equipment if meals are served on-site.<\/p>\n\n\n\n<p>States typically require non-toxic materials, safe sleep equipment that meets Consumer Product Safety Commission (CPSC) standards, and child-proofed electrical outlets and cabinets. Many providers use child care management software for enrollment, billing, attendance tracking, and parent communication.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 6. Organize Operations and Hire Staff<\/h3>\n\n\n\n<p>Family child care homes are often operated solo or with one assistant, while center-based programs require teams of teachers, assistant teachers, and administrative staff. Staff qualifications are set by state regulation and commonly include early childhood credentials, background checks, and training hours.<\/p>\n\n\n\n<p>Operators typically draft staff schedules, develop a written child care program with daily curriculum, prepare an emergency preparedness plan, and document policies on illness, discipline, and parent communication. The Bureau of Labor Statistics reports a median annual wage for child care workers of approximately <strong>$30,370<\/strong> as of May 2023, with regional variation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 7. Launch Marketing<\/h3>\n\n\n\n<p>Marketing for a daycare typically combines local and digital channels. Operators commonly list their facility on state-run child care resource and referral (CCR&amp;R) databases, register on Google Business Profile, partner with local schools and pediatrician offices, and use social media to share daily activities and parent testimonials.<\/p>\n\n\n\n<p>Enrollment campaigns often begin 60 to 90 days before opening. Open house events, referral incentives, and partnerships with local employers offering child care benefits are widely used to fill initial slots.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 8. Open the Daycare<\/h3>\n\n\n\n<p>Once the license is issued, the facility is inspected, and initial enrollments are confirmed, the daycare can open. Many operators run a soft opening with a smaller group of children for the first one to two weeks to refine routines and staff coordination.<\/p>\n\n\n\n<p>State licensing agencies typically conduct an opening inspection and may follow up with periodic unannounced visits to verify ongoing compliance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Is it Also Possible to Open a Daycare as a Franchise?<\/h2>\n\n\n\n<p>Yes, several well-established childcare <a href=\"https:\/\/lexpress-franchise.com\/en-us\/our-franchises\/\">franchise brands <\/a>operate across the United States. <a href=\"https:\/\/lexpress-franchise.com\/en-us\/articles\/what-is-a-franchise\/\">Franchise concepts<\/a> offer brand recognition, a documented operating model, curriculum frameworks, and corporate support, in exchange for an initial fee and ongoing royalties. In the U.S. childcare franchise systems include, e.g.,<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Primrose Schools<\/strong>: premium accredited preschool franchise. According to Entrepreneur&#8217;s Franchise 500 listing, initial investment ranges from approximately <strong>$704,000 to $8,514,000<\/strong>, with a franchise fee of about <strong>$135,000<\/strong> and a 7% royalty.<\/li>\n\n\n\n<li><strong>The Goddard School<\/strong>: large early childhood education franchise with locations across the U.S. Total initial investment typically ranges from approximately <strong>$700,000 to over $1 million<\/strong>, depending on facility size and real estate model.<\/li>\n\n\n\n<li><strong>Kiddie Academy<\/strong>: educational child care franchise with approximately <strong>345 locations<\/strong> across 39 states as of 2025. Initial investment ranges from about <strong>$405,000 to $6,950,000<\/strong>.<\/li>\n\n\n\n<li><strong>The Learning Experience<\/strong>: rapidly expanding early childhood franchise with proprietary curriculum and characters, operating in dozens of states.<\/li>\n\n\n\n<li><strong>Children&#8217;s Lighthouse<\/strong>: faith-friendly early learning franchise targeting families with children from six weeks to 12 years.<\/li>\n<\/ul>\n\n\n\n<p>Prospective franchisees typically review the <a href=\"https:\/\/lexpress-franchise.com\/en-us\/articles\/what-is-a-franchise-disclosure-document\/\">Franchise Disclosure Document (FDD)<\/a> for each system, examining Item 5 (initial fees), Item 6 (royalty and ad fund), Item 7 (estimated initial investment), and Item 19 (financial performance representations). Most state franchise registration portals (California DFPI, Wisconsin DFI, Minnesota Commerce) provide access to current FDD filings.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Much Will It Cost to Open a Daycare in 2026 ?<\/h2>\n\n\n\n<p>How much money is needed to open a daycare depends primarily on whether the program is run from a private home or a commercial facility. There is no single federally published number for total startup costs, so the table below itemizes the actual line items an individual operator typically faces. Each row indicates whether the value comes from a federal or state source, or whether it reflects an industry-typical range without a published national statistic.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Per-operator startup cost ranges for opening a daycare in the United States 2026<\/h3>\n\n\n\n<table id=\"tablepress-518\" class=\"tablepress tablepress-id-518\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Cost Item<\/th><th class=\"column-2\">Home-based family child care<\/th><th class=\"column-3\">Center-based daycare<\/th><th class=\"column-4\">Source \/ Note<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">State licensing application fee<\/td><td class=\"column-2\">$25 to $300<\/td><td class=\"column-3\">$100 to $500<\/td><td class=\"column-4\">State child care licensing agencies (varies by state)<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">FBI fingerprint background check (per person)<\/td><td class=\"column-2\">$25 to $75<\/td><td class=\"column-3\">$25 to $75<\/td><td class=\"column-4\">FBI Criminal Justice Information Services<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Business registration (LLC formation)<\/td><td class=\"column-2\">$50 to $500<\/td><td class=\"column-3\">$50 to $500<\/td><td class=\"column-4\">Secretary of State, varies by state<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Pre-service training and CPR\/First Aid certification<\/td><td class=\"column-2\">$100 to $500<\/td><td class=\"column-3\">$500 to $2,000 (per staff member)<\/td><td class=\"column-4\">State-mandated; industry-typical fee<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">General liability insurance (annual premium)<\/td><td class=\"column-2\">$500 to $1,500<\/td><td class=\"column-3\">$1,500 to $5,000<\/td><td class=\"column-4\">Industry-typical; no federal statistic<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">Buildout, renovation, code compliance<\/td><td class=\"column-2\">$0 to $5,000<\/td><td class=\"column-3\">$25,000 to $500,000+<\/td><td class=\"column-4\">Industry-typical; depends on facility condition<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">Equipment (cribs, furniture, toys, learning materials)<\/td><td class=\"column-2\">$2,000 to $10,000<\/td><td class=\"column-3\">$30,000 to $200,000<\/td><td class=\"column-4\">Industry-typical; CPSC standards required for cribs<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">Outdoor play structures<\/td><td class=\"column-2\">$1,000 to $5,000<\/td><td class=\"column-3\">$10,000 to $50,000<\/td><td class=\"column-4\">Industry-typical<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">Initial marketing and enrollment campaign<\/td><td class=\"column-2\">$500 to $3,000<\/td><td class=\"column-3\">$5,000 to $20,000<\/td><td class=\"column-4\">Industry-typical<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">Working capital (3 to 6 months of expenses)<\/td><td class=\"column-2\">$5,000 to $15,000<\/td><td class=\"column-3\">$50,000 to $200,000+<\/td><td class=\"column-4\">SBA business planning guidance<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">Approximate total startup investment<\/td><td class=\"column-2\">$10,000 to $40,000<\/td><td class=\"column-3\">$125,000 to $1,000,000+<\/td><td class=\"column-4\">Synthesis of line items above<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-518 from cache -->\n\n\n<p><em> State and federal fees are sourced from the relevant agencies; equipment, insurance, and buildout figures are industry-typical ranges and not federally aggregated statistics.<\/em><\/p>\n\n\n\n<p>For a home-based family child care, the total out-of-pocket investment for an individual operator typically falls in the low-five-figure range. For a center-based daycare, the figure runs from the high five figures for a small leased space to over a million dollars for a fully built-out, larger-capacity facility. Real estate (lease or purchase) is excluded from the table because it varies so widely by location that a single national range is not meaningful.<\/p>\n\n\n\n<p>The franchise table below uses figures published directly in the FDDs of the largest U.S. childcare franchise systems and in Entrepreneur&#8217;s Franchise 500 audit listings. For independent (non-franchise) daycares, no aggregate published statistic exists, which is why a side-by-side independent column is not shown.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Investment figures for the three largest US daycare franchise systems<\/h3>\n\n\n\n<table id=\"tablepress-519\" class=\"tablepress tablepress-id-519\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Franchise Brand<\/th><th class=\"column-2\">Initial Franchise Fee<\/th><th class=\"column-3\">Total Initial Investment<\/th><th class=\"column-4\">Royalty<\/th><th class=\"column-5\">Primary Source<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Primrose Schools<\/td><td class=\"column-2\">$135,000<\/td><td class=\"column-3\">$704,000 to $8,514,000<\/td><td class=\"column-4\">7% of gross revenue<\/td><td class=\"column-5\">Entrepreneur Franchise 500 listing (audits FDD)<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Kiddie Academy<\/td><td class=\"column-2\">~$120,000<\/td><td class=\"column-3\">$405,000 to $6,950,000<\/td><td class=\"column-4\">7% of gross revenue<\/td><td class=\"column-5\">Entrepreneur Franchise 500 listing (audits FDD)<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">The Goddard School<\/td><td class=\"column-2\">~$135,000<\/td><td class=\"column-3\">$700,000 to $1,070,000+ (typical)<\/td><td class=\"column-4\">7% of gross revenue (plus 4% marketing fee)<\/td><td class=\"column-5\">goddardschoolfranchise.com (brand franchise dev site)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-519 from cache -->\n\n\n<p><em> FDD-audited or brand-published primary-source data. Ranges reflect facility size and whether real estate is leased or purchased. Smaller daycare franchises (The Learning Experience, Children&#8217;s Lighthouse) also operate in the US but with less publicly accessible primary-source financial data.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Get Funding to Open a Daycare<\/h2>\n\n\n\n<p>Several funding sources exist for prospective daycare operators in the United States. Federal, state, and private programs support both startup costs and operating expenses.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>SBA 7(a) loan<\/strong>: general-purpose small business loan guaranteed by the U.S. Small Business Administration, commonly used for working capital, equipment, and real estate. For-profit child care centers are standard SBA-eligible businesses.<\/li>\n\n\n\n<li><strong>SBA 504 loan<\/strong>: long-term, fixed-rate financing of up to <strong>$5 million<\/strong> for fixed assets such as equipment and facilities.<\/li>\n\n\n\n<li><strong>SBA Microloan<\/strong>: loans up to <strong>$50,000<\/strong> for small businesses, including child care providers.<\/li>\n\n\n\n<li><strong>USDA Rural Development Community Facilities Direct Loan &amp; Grant Program<\/strong>: financing for rural daycare facility upgrades, renovations, or new construction.<\/li>\n\n\n\n<li><strong>Child Care and Development Block Grant (CCDBG)<\/strong>: federal program providing child care subsidies; FY2026 funding totals <strong>$8.83 billion<\/strong> per Congressional appropriations.<\/li>\n\n\n\n<li><strong>Head Start and Early Head Start<\/strong>: federal grant programs supporting comprehensive early childhood services for low-income families, funded at <strong>$12.36 billion<\/strong> in FY2026.<\/li>\n\n\n\n<li><strong>State-level grants and tax credits<\/strong>: many states operate dedicated child care expansion grant programs and small business tax credits.<\/li>\n<\/ul>\n\n\n\n<p>Each program has eligibility rules tied to facility type, location, license status, and the population served. Detailed criteria for each program are published on SBA.gov, USDA.gov, the Office of Child Care, and state child care administrator websites.<\/p>\n\n\n<div class=\"lf-gut-blog-post-cta-efference\" style=\"border-color: var(--tertiary);\"><div class=\"lf-gut-blog-post-cta-efference__icon\" style=\"color: var(--tertiary);\"><svg class=\"icon-thumb-up\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"35\" height=\"35\" viewBox=\"0 0 48 48\" fill=\"none\" style=\"color: var(--tertiary);\"><path fill=\"currentColor\" d=\"M21.4998 4.89989L20.8499 4.13985L20.8474 4.14202L21.4998 4.89989ZM26.5397 4.89989L27.1922 4.14197L27.1842 4.13526L26.5397 4.89989ZM29.6998 7.62011L30.3547 6.86441L30.3522 6.86223L29.6998 7.62011ZM40.4197 18.3401L41.1776 17.6877L41.1754 17.6851L40.4197 18.3401ZM43.1398 21.5L43.8998 20.8501L43.8977 20.8476L43.1398 21.5ZM43.1398 26.54L43.8977 27.1924L43.9044 27.1845L43.1398 26.54ZM40.4197 29.6999L41.1754 30.3549L41.1776 30.3523L40.4197 29.6999ZM29.6998 40.4199L30.3521 41.1778L30.3547 41.1756L29.6998 40.4199ZM26.5397 43.1399L27.1896 43.8999L27.1921 43.8978L26.5397 43.1399ZM21.4998 43.1399L20.8474 43.8978L20.8553 43.9045L21.4998 43.1399ZM18.3398 40.4199L17.6849 41.1756L17.6874 41.1778L18.3398 40.4199ZM7.57978 29.6999L8.34803 29.0597L8.34206 29.0527L7.57978 29.6999ZM4.87977 26.52L4.11427 27.1635L4.11748 27.1672L4.87977 26.52ZM4.87977 21.52L4.11747 20.8728L4.11428 20.8766L4.87977 21.52ZM7.57978 18.3401L8.3421 18.9873L8.348 18.9803L7.57978 18.3401ZM18.3398 7.62011L17.6874 6.86223L17.6849 6.86442L18.3398 7.62011ZM22.6797 31.88L23.3869 31.1729L23.3416 31.1276L23.291 31.0886L22.6797 31.88ZM30.6198 30.4801L29.6694 30.1688L29.6583 30.2028L29.6496 30.2375L30.6198 30.4801ZM32.8597 23.64L31.917 23.3064L31.9131 23.3175L31.9094 23.3288L32.8597 23.64ZM26.3998 20.0802L25.4113 19.9286L25.4089 19.9442L25.407 19.9598L26.3998 20.0802ZM26.8597 17.0802L25.8819 16.8706L25.8758 16.8995L25.8713 16.9286L26.8597 17.0802ZM25.6398 15.0201L25.2859 15.9554L25.3046 15.9625L25.3235 15.9688L25.6398 15.0201ZM23.5798 15.68L22.7523 15.1185L22.7504 15.1213L23.5798 15.68ZM22.1496 5.65993C23.1528 4.80216 24.8649 4.79607 25.8953 5.66452L27.1842 4.13526C25.4146 2.64371 22.6067 2.63762 20.8499 4.13986L22.1496 5.65993ZM25.8873 5.65777L29.0474 8.37799L30.3522 6.86223L27.1921 4.14201L25.8873 5.65777ZM29.0448 8.3758C29.4608 8.73632 30.0056 9.02413 30.5348 9.22184C31.064 9.41956 31.6657 9.56005 32.2197 9.56005V7.56005C31.9738 7.56005 31.6155 7.49056 31.2347 7.34832C30.8539 7.20605 30.5387 7.0239 30.3547 6.86442L29.0448 8.3758ZM32.2197 9.56005H35.6198V7.56005H32.2197V9.56005ZM35.6198 9.56005C37.1875 9.56005 38.4797 10.8522 38.4797 12.4199H40.4797C40.4797 9.74759 38.292 7.56005 35.6198 7.56005V9.56005ZM38.4797 12.4199V15.8201H40.4797V12.4199H38.4797ZM38.4797 15.8201C38.4797 16.3655 38.6209 16.9672 38.8174 17.4959C39.0139 18.0247 39.3014 18.5765 39.6641 18.995L41.1754 17.6851C41.0181 17.5036 40.8356 17.1854 40.6921 16.7993C40.5486 16.4129 40.4797 16.0547 40.4797 15.8201H38.4797ZM39.6619 18.9925L42.3819 22.1524L43.8977 20.8476L41.1776 17.6877L39.6619 18.9925ZM42.3797 22.1499C43.2375 23.153 43.2436 24.8652 42.3751 25.8956L43.9044 27.1845C45.396 25.4149 45.402 22.607 43.8998 20.8501L42.3797 22.1499ZM42.3819 25.8876L39.6619 29.0476L41.1776 30.3523L43.8977 27.1924L42.3819 25.8876ZM39.6641 29.045C39.3035 29.461 39.0157 30.0058 38.818 30.535C38.6203 31.0642 38.4797 31.6659 38.4797 32.22H40.4797C40.4797 31.974 40.5492 31.6157 40.6915 31.2349C40.8338 30.8541 41.0159 30.5389 41.1754 30.3549L39.6641 29.045ZM38.4797 32.22V35.6201H40.4797V32.22H38.4797ZM38.4797 35.6201C38.4797 37.1878 37.1875 38.48 35.6198 38.48V40.48C38.292 40.48 40.4797 38.2924 40.4797 35.6201H38.4797ZM35.6198 38.48H32.2197V40.48H35.6198V38.48ZM32.2197 38.48C31.6744 38.48 31.0726 38.6211 30.544 38.8176C30.0152 39.014 29.4633 39.3015 29.0448 39.6642L30.3547 41.1756C30.5362 41.0183 30.8544 40.8358 31.2405 40.6923C31.6269 40.5488 31.9851 40.48 32.2197 40.48V38.48ZM29.0474 39.662L25.8874 42.382L27.1921 43.8978L30.3521 41.1778L29.0474 39.662ZM25.8899 42.3798C24.8867 43.2376 23.1746 43.2437 22.1442 42.3753L20.8553 43.9045C22.6249 45.3961 25.4328 45.4021 27.1896 43.8999L25.8899 42.3798ZM22.1521 42.382L18.9922 39.662L17.6874 41.1778L20.8474 43.8978L22.1521 42.382ZM18.9947 39.6642C18.5787 39.3037 18.0339 39.0159 17.5047 38.8182C16.9755 38.6205 16.3738 38.48 15.8198 38.48V40.48C16.0657 40.48 16.4241 40.5495 16.8048 40.6917C17.1856 40.834 17.5008 41.0161 17.6849 41.1756L18.9947 39.6642ZM15.8198 38.48H12.3597V40.48H15.8198V38.48ZM12.3597 38.48C10.792 38.48 9.49976 37.1878 9.49976 35.6201H7.49976C7.49976 38.2924 9.6875 40.48 12.3597 40.48V38.48ZM9.49976 35.6201V32.1999H7.49976V35.6201H9.49976ZM9.49976 32.1999C9.49976 31.6539 9.35826 31.0572 9.16508 30.5353C8.9714 30.0121 8.69178 29.4723 8.348 29.0598L6.81156 30.3401C6.96777 30.5276 7.14815 30.8478 7.28945 31.2296C7.43127 31.6127 7.49976 31.966 7.49976 32.1999H9.49976ZM8.34206 29.0527L5.64205 25.8728L4.11748 27.1672L6.81749 30.3472L8.34206 29.0527ZM5.64525 25.8766C4.79794 24.8685 4.79794 23.1715 5.64525 22.1635L4.11428 20.8766C2.64159 22.6285 2.64159 25.4115 4.11428 27.1635L5.64525 25.8766ZM5.64205 22.1672L8.34206 18.9873L6.81749 17.6928L4.11748 20.8728L5.64205 22.1672ZM8.348 18.9803C8.69178 18.5677 8.9714 18.028 9.16508 17.5047C9.35826 16.9828 9.49976 16.3861 9.49976 15.8401H7.49976C7.49976 16.074 7.43127 16.4273 7.28945 16.8104C7.14815 17.1922 6.96777 17.5124 6.81156 17.6999L8.348 18.9803ZM9.49976 15.8401V12.4199H7.49976V15.8401H9.49976ZM9.49976 12.4199C9.49976 10.8522 10.792 9.56005 12.3597 9.56005V7.56005C9.6875 7.56005 7.49976 9.74759 7.49976 12.4199H9.49976ZM12.3597 9.56005H15.8198V7.56005H12.3597V9.56005ZM15.8198 9.56005C16.3651 9.56005 16.9669 9.4189 17.4956 9.22247C18.0244 9.02599 18.5762 8.7385 18.9947 8.3758L17.6849 6.86442C17.5034 7.02171 17.1852 7.2042 16.799 7.34769C16.4127 7.49123 16.0544 7.56005 15.8198 7.56005V9.56005ZM18.9922 8.37798L22.1522 5.65777L20.8474 4.14202L17.6874 6.86224L18.9922 8.37798ZM19.1685 30.4314L22.0685 32.6714L23.291 31.0886L20.3911 28.8486L19.1685 30.4314ZM21.9726 32.5871C22.3408 32.9552 22.8395 33.1544 23.2304 33.2648C23.645 33.3819 24.0864 33.44 24.4598 33.44V31.44C24.2731 31.44 24.0145 31.4081 23.7741 31.3401C23.6565 31.3069 23.5592 31.2695 23.4859 31.233C23.4093 31.1948 23.3839 31.1699 23.3869 31.1729L21.9726 32.5871ZM24.4598 33.44H27.9998V31.44H24.4598V33.44ZM27.9998 33.44C28.799 33.44 29.5865 33.1456 30.2139 32.6881C30.842 32.2301 31.3818 31.5549 31.5899 30.7226L29.6496 30.2375C29.5777 30.5252 29.3675 30.83 29.0356 31.072C28.7031 31.3145 28.3205 31.44 27.9998 31.44V33.44ZM31.5701 30.7913L33.8101 23.9512L31.9094 23.3288L29.6694 30.1688L31.5701 30.7913ZM33.8025 23.9735C34.1312 23.0445 34.0165 22.0828 33.4742 21.3419C32.9352 20.6053 32.0571 20.2 31.0798 20.2V22.2C31.5024 22.2 31.7444 22.3647 31.8603 22.5231C31.973 22.6772 32.0483 22.9354 31.917 23.3064L33.8025 23.9735ZM31.0798 20.2H27.3398V22.2H31.0798V20.2ZM27.3398 20.2C27.3373 20.2 27.3416 20.1997 27.3504 20.2035C27.359 20.2074 27.3692 20.2142 27.3782 20.2243C27.3876 20.235 27.3914 20.2444 27.3923 20.2472C27.3932 20.2503 27.3881 20.2367 27.3925 20.2005L25.407 19.9598C25.2548 21.2156 26.1799 22.2 27.3398 22.2V20.2ZM27.3882 20.2317L27.8482 17.2317L25.8713 16.9286L25.4113 19.9286L27.3882 20.2317ZM27.8375 17.2897C28.1304 15.9229 27.2511 14.5031 25.956 14.0714L25.3235 15.9688C25.7084 16.0971 25.949 16.5575 25.8819 16.8706L27.8375 17.2897ZM25.9937 14.0848C25.3555 13.8433 24.6881 13.9027 24.1473 14.0902C23.612 14.2757 23.0868 14.6256 22.7523 15.1185L24.4072 16.2415C24.4528 16.1744 24.5875 16.0543 24.8023 15.9799C25.0114 15.9074 25.1841 15.9169 25.2859 15.9554L25.9937 14.0848ZM22.7504 15.1213L18.9104 20.8212L20.5691 21.9387L24.4091 16.2387L22.7504 15.1213ZM15.9998 29.6399V20.48H13.9998V29.6399H15.9998ZM15.9998 20.48C15.9998 20.2144 16.0287 20.0485 16.0604 19.9495C16.0888 19.8605 16.1152 19.837 16.121 19.8316C16.1424 19.812 16.2914 19.7 16.8798 19.7V17.7C16.1482 17.7 15.3571 17.8179 14.7685 18.3583C14.1585 18.9183 13.9998 19.7102 13.9998 20.48H15.9998ZM16.8798 19.7H17.8198V17.7H16.8798V19.7ZM17.8198 19.7C18.3941 19.7 18.5477 19.8104 18.574 19.8344C18.5776 19.8376 18.6998 19.9386 18.6998 20.48H20.6998C20.6998 19.7014 20.532 18.9123 19.9205 18.3556C19.3318 17.8195 18.5455 17.7 17.8198 17.7V19.7ZM18.6998 20.48V29.6399H20.6998V20.48H18.6998ZM18.6998 29.6399C18.6998 30.1755 18.5805 30.2788 18.5752 30.2838C18.5511 30.3061 18.3996 30.4199 17.8198 30.4199V32.4199C18.56 32.4199 19.3484 32.2937 19.9343 31.751C20.539 31.191 20.6998 30.4043 20.6998 29.6399H18.6998ZM17.8198 30.4199H16.8798V32.4199H17.8198V30.4199ZM16.8798 30.4199C16.2914 30.4199 16.1424 30.3079 16.121 30.2883C16.1152 30.2829 16.0888 30.2593 16.0604 30.1704C16.0287 30.0714 15.9998 29.9055 15.9998 29.6399H13.9998C13.9998 30.4097 14.1585 31.2015 14.7685 31.7616C15.3571 32.302 16.1482 32.4199 16.8798 32.4199V30.4199Z\"\/><\/svg><\/div><p class=\"lf-gut-blog-post-cta-efference__title lf-transform-none\">Good to know:<\/p><div class=\"lf-gut-blog-post-cta-efference__lede\">\n<div class=\"wp-block-lexpress-highlighted-text-v2 lf-gut-blog-post-cta-efference__lede\">\n<p>Some operators of 24-hour daycare programs serving shift workers and healthcare staff have accessed additional state-level grants tied to workforce support. Eligibility for grants to open a daycare typically requires a state license, a documented business plan, and in many cases, agreement to serve children receiving CCDBG subsidies. The Office of Child Care publishes a state-by-state directory of administrators.<\/p>\n<\/div>\n<\/div><\/div>\n\n\n<p><em>This content is provided for informational purposes only and does not constitute legal, tax, financial, or professional advice. Laws and regulations vary by state and individual circumstances and may change over time. Readers should consult a qualified attorney, tax professional, or other licensed professional regarding their specific situation. Nothing herein creates an attorney-client relationship.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The U.S. child care market generated roughly $65 billion in revenue in 2024 and is projected to reach $109 billion by 2033. With about 12.3 million children under five enrolled in regular care arrangements, the daycare sector remains one of the largest service-driven small business categories in the country. This guide walks through the licensing, [&hellip;]<\/p>\n","protected":false},"author":788,"featured_media":1764927,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"How to Open a Daycare in the US in %%currentyear%%: Costs, Licensing & Steps to Follow","_seopress_titles_desc":"How to open a daycare in the US in %%currentyear%%: state licensing, costs, business structure, equipment, franchise options, and federal funding programs.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"content-type":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"1558535,1580783,1603810,1649109,1632352,1652387","_relevanssi_noindex_reason":"","footnotes":""},"categories":[3473,3607],"tags":[],"type-de-post":[438],"class_list":{"0":"post-1763391","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-entrepreneur-stories","8":"category-entrepreneurship","9":"type-de-post-articles"},"acf":[],"_links":{"self":[{"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/posts\/1763391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/users\/788"}],"replies":[{"embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/comments?post=1763391"}],"version-history":[{"count":5,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/posts\/1763391\/revisions"}],"predecessor-version":[{"id":1765213,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/posts\/1763391\/revisions\/1765213"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/media\/1764927"}],"wp:attachment":[{"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/media?parent=1763391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/categories?post=1763391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/tags?post=1763391"},{"taxonomy":"type-de-post","embeddable":true,"href":"https:\/\/lexpress-franchise.com\/en-us\/wp-json\/wp\/v2\/type-de-post?post=1763391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}